AVA McCLUSKEY, PMP
Professional Summary:
Seasoned and successful project manager adept at ensuring the on-time, on-budget, and quality delivery of largescale
projects up to $18B in scope; extensive experience directing all phases of project portfolios, from strategic
planning, to design, to construction, including design/build delivery. Creative problem solver with history of success
implementing and standardizing processes to ISO standards. Entrepreneurial-minded leader with extensive
experience delivering multi-million-dollar projects.
Computing Skills:
Primavera – P6, SureTrak, P3, Contract Manager, Pertmaster, Meridian – Prolog, Proliance; AutoDesk –
Constructware; Bentley - Projectwise; Huddle - On Line Project Management; Skire - Unifier; PRISM – Project
Management Suite; Via Novus – Paragon Project Suite; Secutor Solutions; Quickbooks; Microsoft – Outlook, Word ,
Excel, Power Point, Project.
Education:
Business Administration Major, Urban Land Economics Minor 1986 - 1989
University of California at Berkeley
Business Administration Major, 1980 - 1985
El Camino College
Professional Certifications: Project Management Professional – PMI (PMP Certification #521700);
Project/Work Experience:
Si3 Management Group LLC
2008-2010
Established company and positioned project management consulting firm for success by building 5-year strategic
business plan and developing sustainable corporate policies and procedures based upon ISO format. Assumed chief
executive role, successfully branding company, developing long-term relationships and securing multiple
engagements.
Planning and Management Services Inc.
2007-2008
Port of Tacoma YTTI redevelopment Project; $365M, Managed multiple, simultaneous public sector facility and
infrastructure consulting projects engagements, providing marine development program delivery services to the
Ports of Tacoma and Seattle, including construction and design phase scheduling, estimating, budgeting. cost
controls, document management and risk management services..
Carter Burgess, Inc.
2005-2007
Alameda County Congestion Management Agency (ACCMA) / California Department of Transportation
(Caltrans), I680/Sunol Grade Southbound HOV/HOT Program; $200M
provided programmatic cost
engineering analysis to integrate this first of its kind, $200 million plus program. The program funding plan includes
sixteen funding sources, two project delivery agencies and dozens of contracts and consultants. All have been
assembled to finance the design, construction, equipment integration, roadway rehabilitation and initial operation.
Due to the complexity of managing a multiplicity of funding programs, consultants, contractors and stakeholders,
Carter & Burgess, Inc. acquired additional technology and to developed a more robust methodology for managing
Program Budgets, Costs, Schedule and Performance.
Washington State Department of Transportation(WSDOT) Program Management; As Senior Program Manager,
provided Tier 2 program management and project controls expertise for the Olympic Region. Project controls
oversight of several hundred projects included scoping, design or construction; interface with region project
engineers and region specialty office groups, and supervision of state-hired project controllers. Developed personnel
descriptions, work plans, interim procedural gap analysis tools, and procedures to remedy. Developed staffing plans
and project and program schedules. Developed construction document management procedures. Provided Fiscal
4116 Cashmere Drive NE Lacey WA 98516
(360) 438-6113 Home, (206) 612-0640 Cell, (360) 459-2664 Fax’
avamisaacson@comcast.net
Year Manpower/dollar budgets based on task assignment. Provided expert analysis to the DOT and made
recommendations to improve efficiency of delivery. Assisted with transition from project management systems to
enterprise management systems at the region and statewide level..
WSDOT Port Orchard Construction Office –Bremerton Tunnel Project, $49.1 Million Reviewed and ultimately
accepted Contractor’s schedule for performing construction work, identified critical gaps in construction
schedule, evaluated progress and provided time impact analysis for delay claim.
AECOM (DMJM/DMJM HARRIS), Inc.
1998-2005
PM/CM Department Manager; Drove multi-million-dollars in new business by playing key role in many business
development teams. Won many major contracts, including Greenbush Old Colony Rail Program Management
contract, Second Avenue Subway Design/Engineering contract for NYMTA in New York, New York, and State
Highway 212 design-build program management contract. Assembled and trained high-performance teams.
Provided expert consulting services to public agencies.
Project Manager: Trunk Highway 212 Project, Minnesota Department of Transportation, $275M As the Project
Manager, Ava is managing a team of design reviewers, office engineers, schedulers, cost engineers and document
control specialists as well as quality assurance as part of the MnDOT’s design build verification team providing
oversight of the TH212 Design/Build Project. The Trunk Highway (TH) 212 Design-Build Project consists of the
realignment of 11.75 miles of a controlled access, four-lane highway with 31 structures with interchanges and
overpasses.
Project Controls Manager and Lead Scheduler: Puerto Rico Highway and Transit Authority forTrèn Urbano Design
Build valued at $2.5B, As Program Control Manager, supervising a staff of fifteen, Ava provided oversight of project
scheduling, cost engineering, earned value reporting, cash flow planning, estimating, change & claims analysis to the
Puerto Rico Highway and Transit Authority. The firm’s responsibilities include preliminary design, construction
management and technical oversight during construction of a 17.5 kilometer, 16 station, heavy-rail rapid transit
system. The design/build construction for this $1.675 billion dollar project consists of at grade guide way (open cut
and retained cut), elevated (segmental bridge) guide way, twin EPBM and NATM tunnels as well as construction of
maintenance facilities, operations, command and control centers.
Lead Construction Scheduler and Claims Analyst: Massachusetts Bay Transit Authority for Russia Wharf Silver Line
Extension Construction Services valued at $275M served in the capacity of senior project controls engineer,
providing scheduling oversight and claims support to the MBTA as part of the firm’s technical services during
construction. The transit system is a $485 million 3-mile underground transit system
Project Controls Manager: for Greenbush Old Colony Rail Extension Design Build valued at approximately $485M.
As the Program Control Manager, Ava is managing a team of schedulers, cost engineers, project controls
specialists and document control specialists as well as quality assurance as part of the MBTA’s program
management team for the Greenbush Design/Build Project. The Greenbush project will restore commuter rail
service along an 18 mile corridor, serving several coastal communities in Boston’s south shore. The project involves
reconstruction of a largely out-of-service railroad, (1.5 active local freight), and includes 4 controlled passage
sidings, 7 new stations, new signal and communication systems and an end of line layover facility. Also included in
the project are 9 single span railroad bridges, 2 roadway bridges, 4 new grade separations and an 800’ long cut
and cover tunnel
Manchester School Facilities Improvement Program, City of Manchester, New Hampshire: As the Program and
Construction Management Department Manager, Ava was responsible for oversight of the document control and
scheduling staff, providing project controls support and contract change analysis for the City of Manchester. The
$100 million dollar Design Build Finance Program consists of design and construction oversight for all schools
facilities within the City of Manchester.
Facilities Assessment and Capital Evaluation Manager: Expedited and ensured accuracy of $1.5Billion, 253building
inventory assessment and renovation program for Detroit Public Schools. Performed facilities assessment,
programmed renovations, managed a team of more than twenty architects, urban planners and building inspectors
to evaluate all 263 schools presently being operated by the Detroit Public Schools System. The goal of this
evaluation was to ascertain candidates for investment or consolidation, and develop work packages for renovating
and/or remodeling each facility as part of the overall five year $1.2 billion dollar capital improvement program.
4116 Cashmere Drive NE Lacey WA 98516
(360) 438-6113 Home, (206) 612-0640 Cell, (360) 459-2664 Fax’
avamisaacson@comcast.net
Developed prioritization analysis system, scheduled work to obtain multi year bond financing, developed Facilities
Assessment and Capital Evaluation Systems Software to manage cost, schedule and finance data.. Developed the
program master schedule for new facilities construction and drafted project controls policies and procedures.
Program Controls Manager Developed the Program Master Schedule for the $18B Iraq Infrastructure
Reconstruction Program after declaration of victory; worked with Department of State at the Pentagon to provide
PMO rear support. Collaborated with Total Resource Management (TRM) in Alexandria to interface Primavera for
construction management, with Maximo for asset management, with the Army Corps of Engineers financial
management systems I
IRS Customer Service Centers, Nationwide $300M: Served in the capacity of Program Control Manager providing
scheduling, earned value management and claims support for this national supplemental contract for GSA. Provided
program and construction management services to GSA for the delivery of 5 Customer Service Centers located
across the country.
PB Americas Inc
Project Controls Manager
1995-1998
MetroWest Water Supply Tunnel: $735M, on-site project controls manager for Massachusetts Water Resources
Authority major construction management contract. Responsible for. scheduling, cost engineering, change order
management, claims analysis. Drafted scheduling and cost section for several construction contracts Prepared as
planned schedule to defend $3 million claim for defective specifications. Evaluated contractor progress and
performance.
Parsons Inc,
Chief Cost Engineer
1994-1995
Red Line Segment Two Subway Construction, Los Angeles, California $3B Responsible for management of
construction cost engineering activities including fiscal year budgeting and management of multiple public and
private funding sources, cost forecasting, earned value reporting, cash flow planning, field claims mitigation and
analysis and direct client interface for overall project cost management and reporting. Ava oversaw contractor
payments on 49 construction contracts averaging $20-million monthly and change order activity at both the work
package and total project level.
ICF Kaiser Engineers/Tudor Engineering Co.
1990-1994
Developed Project Schedules and monitored progress/earned value for multiple public sector design and
construction contracts for Bay Area Rapid Transit (BART), CALTRANS, Alameda County and Los Angles Counties.
Professional References: (See Attached Written Letters of Reference)
4116 Cashmere Drive NE Lacey WA 98516
(360) 438-6113 Home, (206) 612-0640 Cell, (360) 459-2664 Fax’